EVACUATE A/C SYSTEM. PULL VACUUM ON SYSTEM TO REMOVE MOISTURE AND CONTAMINANTS. RECHARGE SYSTEM TO FACTORY SPECIFICATIONS AND CHECK FOR LEAKS. RECORD HIGH SIDE AND LOW SIDE PRESSURES, AMBIENT AIR AND VENT TEMPERATURE. LOW SIDE – _200PSI_ HIGH SIDE – _45PSI__ VENT TEMP _60F_ AMBIENT TEMP _85F_
INTELLIGENT POWER DISTRIBUTION MODULE – Remove & Replace – IPDM E/R
JESUS F. gave our service a 5 star review on 3/24/2026
TIE ROD &/OR END – Remove & Replace – Inner,Both Sides – [Includes: R&I Outer Tie Rod Ends.] – [Includes: Adjust toe-in only. NOTE: Deduct .4 if alignment is also performed. NOTE: Manufacturer recommends removal of Rack and Pinion Steering Gear when repla
ALIGNMENT
WENDY M. gave our service a 5 star review on 3/7/2025